top of page

Will We Get to Walk Through Our Build Before It’s Finished?

Oct 28
2 min read

The key moments you’ll see your project take shape, from base to handover.


Yes, at several key points along the way.


Plans on paper only tell you so much, and on many projects the first time you can walk through the finished space is the day it’s handed over. We’d rather you saw it come together as it happens. So at set points along the way, we walk clients through the build, which gives you a real sense of the space and the chance to raise anything while the project is still in progress.


1. Base stage


On an Impact Build site in the Macedon ranges as the slab has just gone down and they are ready for Frame Stage.

Once the slab or subfloor is complete, you can stand on the base of your home for the first time. The plans become a footprint you can walk around, and you can see where each room will sit. This walkthrough applies to projects with a new slab or subfloor.


2. Frame stage


A photo of a house frame on site at Impact Build in the Macedon Ranges.

This is the one most clients remember. With the frame up and nothing closed in yet, we walk through every room together to confirm the layout, the room sizes and the window positions. Before you walk it, our own quality check has been completed and the building surveyor has inspected the frame. It’s the point where a room you’ve only seen on paper can be seen at its real size.


3. Outdoor areas


An employee of Impact Build, measuring and building an outdoor deck for their client in the Macedon Ranges.

When the decking, outdoor areas and other external works are complete, we walk through them with you. For many homes the outdoor space is as much a part of how the property is used as the rooms inside, so it gets its own milestone.


4. Driveway and landscaping


Luke Said from Impact build pointing and running through pre-handover checks with a client.

The last external stage is the driveway and landscaping. Once they’re complete, we walk the finished exterior with you before we move into handover.



5. Pre-handover


Final walk-through on site in the Macedon Ranges by Impact Build.

Before the keys change hands, we’ve already been through the home room by room, addressed what we found, and the building surveyor has completed the final inspection. Then we walk the whole property with you, covering every room, every system and every outdoor area, and anything you raise is actioned before handover.


Which walkthroughs apply to your project


Not every project has all five. A renovation without a new slab won’t have a base stage walkthrough, and not every project includes landscaping. Which ones apply depends on the size and type of your project.


Why we run a build this way


By handover, nothing about the finished home should be a surprise. Walking through at each stage is part of how we make that true, alongside regular updates from your Project Manager. When the day comes, you’re not seeing it for the first time. You’re seeing the result of a process you’ve followed from the start.


We build from our base in Kyneton, with projects across the Macedon Ranges, Hepburn and Mount Alexander shires.


Planning a renovation, extension or new build and want to know how we’d run your project? Start with the Plan Your Build form at impactbd.com.au/plan-your-build. → Learn about our planning process



About the author


The author of Impact Build Blog posts and owner of Impact Build Luke Said, with his two Border Collies.

Luke Said is a Master Builder and the founder of Impact Build, a Kyneton-based building company serving the Macedon Ranges, Hepburn and Mount Alexander shires. He directs the business day to day.

bottom of page