What Happens Before You Actually Start Building?

Nov 8
2 min read

A lot, and you’re involved from the very first conversation.


Before work starts on site, we work through more than 100 steps of our process, so the build is set up to run smoothly. Here’s what happens, in the order it happens.


1. The first conversations


It starts with a conversation about what you want to build, your rough budget and any planning hurdles you already know about. You don’t need plans drawn up to begin. We also check that our early process suits what you’re after, because the sooner we’re aligned, the smoother the rest of the project runs.


2. Planning with your designer


Luke Said from Impact Build, working on the computer alongside a designer to ensure all blueprints are correct and finalised before building starts.

We join the planning stage early and work alongside your designer, so ideas can be checked against buildability and budget while changes are still easy to make. You’ll receive a qualifying estimate, an early picture of the cost before the plans are final, and early selections are discussed. Where your project needs one, the planning permit is approved at this stage too.


3. The reports that shape your design


Before the design is finalised, a handful of reports are organised, and each one shapes a different part of your home.


The soil test shows how the ground is likely to behave, which guides how your footings are designed. Engineering shapes the structure. The energy report guides the insulation specification. The bushfire attack level assessment rates how exposed your site is to bushfire, taking in the slope, the surrounding vegetation and how close it sits, and that rating sets the materials and construction your building permit requires. You’re copied in on correspondence with these consultants, so you always know what’s been raised.


4. Contract and permit


Once the design and estimate are settled, we move to the building contract. Home Warranty insurance (domestic building insurance) is arranged before any deposit is requested, and the building permit is issued by the building surveyor before any construction or demolition can begin. The surveyor reviews the project documents to confirm they meet the relevant codes and regulations.


5. Lining everything up


The site sign going up in Malmsbury on an Impact Build site.

Then comes the organising that clients rarely see. Trades and suppliers are confirmed, orders are placed and a detailed schedule is set. We introduce ourselves to your neighbours, and before work begins we take photographs of neighbouring properties and surrounding council assets to establish a clear record. The site sign goes up, and the notice of commencement is issued.


Why this stage matters


That’s why the soil test, engineering and energy report come in before the design is final, not after, and why you’re copied in on what each consultant raises. By the time the crew arrives, the decisions have been made, the right people are booked, and you know what’s coming next.


Impact Build is based in Kyneton and builds across the Macedon Ranges, Hepburn and Mount Alexander shires.




About the author


Luke Said from Impact Build, smiling and posing for a portrait with his two Border Collies.

Luke Said is a Master Builder and the founder of Impact Build, a Kyneton-based building company serving the Macedon Ranges, Hepburn and Mount Alexander shires. He directs the business day to day.

bottom of page